Skip to content
Stravant Remodeling
Kitchen Remodeling by Stravant Remodeling

A kitchen that works as hard as you do.

Cabinet replacement, full gut renovations and open-plan conversions.

Gallery

  • The Philadelphia kitchen from the dining side: counter-depth fridge, drawers under the counters.
  • The dining area, opened up to the kitchen.
  • Before: cherry cabinets, an old freestanding range and a closed-in layout.
  • Before, from the front of the room: the cherry cabinet run, the old range and the back door.
  • A second cabinet and sink run in the finished basement.

What's included

  • Demolition and disposal of old cabinets and counters
  • Plumbing relocation and fixture hookup
  • Electrical coordination for circuits, lighting and appliances
  • Drywall repair, leveling and paint
  • Cabinet installation and hardware
  • Countertop templating coordination and install
  • Backsplash and floor tile
  • Permits and inspections where required

Pricing

Priced after a walkthrough

Free written estimate

Every kitchen remodeling job is priced line by line after we see the space. These are the things that move the number most.

  • Cabinet grade

    Stock, semi-custom and custom cabinets can differ by three times for the same layout.

  • Moving the sink or stove

    New gas or plumbing runs and venting change the scope and the permit.

  • Removing a wall

    Possible in most houses. In apartments it needs an engineer and board approval first.

  • Counters and appliances

    Quartz, stone and panel-ready appliances swing the budget more than tile does.

Payments follow the work. A deposit at signing, progress payments as phases finish, the balance after the walkthrough. Ask about financing at the estimate.

Free estimate

Tell us about the project

We reply by phone or email. No spam, no sales calls from anyone else.

+ Add details (optional)

Prefer to talk? Call (347) 709-4333 or text photos of the space.

FAQ

How long is a kitchen remodel?

A cabinet and counter replacement runs two to three weeks. A full gut kitchen with layout changes runs five to eight weeks, mostly driven by cabinet and counter lead times.

Can I keep using my kitchen during the work?

Not the main kitchen. We set up a temporary prep station with a sink where possible and schedule the water and gas shutoffs in short windows.

Do you install cabinets I buy myself?

Yes. We install client-supplied cabinets and counters and will check the order against the measurements before it ships.

Do kitchens need a permit in NYC?

Moving plumbing, gas or adding circuits requires a permit. Like-for-like replacement in the same location generally does not. We confirm before quoting.

Planning a kitchen project?

Tell us about the space. We reply by phone or email.

Call now Get a quote