
Smooth walls and clean lines.
New drywall, skim coats over tired plaster, ceiling repairs and full interior paint.New drywall, skim coats over tired plaster, ceiling repairs and full interior paint. The finish work that decides whether a renovation looks done.
- NYC HIC #2137587
- Insured
- Free estimates
Gallery
-
Before: patched plaster and a boxed-in stair in the Philadelphia living room. -
After: smooth walls, new trim and paint, with the stair opened up. -
Upstairs room: painted walls and ceiling, white crown molding, full-height wardrobes. -
A bedroom with the same crown detail and wall color. -
The upstairs hall, painted to match the rooms off it. -
Rear room off the patio: walls and ceiling painted around stained window and door trim. -
Commercial build-out: metal framing for the new drywall ceiling. -
The same space near completion: drywall ceiling, recessed lights, painted walls. -
Finished walls and ceiling, ready for the tenant.
What's included
- Drywall hanging, taping and finishing
- Skim coating and plaster repair
- Ceiling repair and replacement
- Water and crack damage repair
- Priming and two finish coats
- Trim, doors and cabinet painting
- Masking, protection and cleanup
Pricing
Priced after a walkthrough
Free written estimate
Every drywall and painting job is priced line by line after we see the space. These are the things that move the number most.
-
Wall condition
Skimming cracked plaster costs more than painting sound drywall.
-
Ceiling height and access
Stairwells and tall ceilings add setup and time.
-
Colors and sheens
Dark accents, multiple colors and high-gloss trim take extra coats and care.
-
Occupied rooms
Moving and protecting furniture adds a day on most apartments.
Payments follow the work. A deposit at signing, progress payments as phases finish, the balance after the walkthrough. Ask about financing at the estimate.
Free estimate
FAQ
How long does it take to paint a two-bedroom apartment?
Three to five days with normal prep. Add two to four days if walls need skim coating.
Do you handle lead paint in pre-war buildings?
We follow EPA RRP practices for homes built before 1978: containment, wet methods and HEPA cleanup. Tell us the building year when you call.
Which paint brands do you use?
Benjamin Moore and Sherwin-Williams lines by default. If you have a preference we match it.
Planning a drywall and paint project?
Tell us about the space. We reply by phone or email.