Skip to content
Stravant Remodeling
Bathroom Remodeling by Stravant Remodeling

Bathrooms built right the first time.

Full gut renovations, tub-to-shower conversions and tile work for Queens apartments and houses.

Gallery

  • Diagonal set tile and matte black trim in the shower.
  • Vanity and mirrored storage against the plank tile.
  • Bench and niche set before grout.
  • Leveling clips keep large-format tile flat across the wall.
  • Stripped to the studs. New blocking for the vanity and grab bars.
  • Cement board on every wet wall before the membrane goes on.
  • Rough plumbing in, window reframed.
  • Tile going up, walls taped at the seams.
  • Tile carried onto the ceiling over the shower.
  • Recessed lights set into the shower ceiling above the mosaic wall.

What's included

  • Demolition and debris removal
  • Plumbing rough-in and fixture installation
  • Electrical coordination for lighting, fans and outlets
  • Full waterproofing membrane on all wet areas
  • Floor and wall tile, niches, benches and curbs
  • Vanity, toilet, glass and accessory installation
  • Paint and final cleaning
  • Permits and inspections where required

Pricing

Priced after a walkthrough

Free written estimate

Every bathroom remodeling job is priced line by line after we see the space. These are the things that move the number most.

  • Layout changes

    Moving the toilet or shower drain means new plumbing in the slab or joists. Keeping the layout saves the most.

  • Tile and stone

    Large-format porcelain installs faster than mosaic. Natural stone costs more to buy and to seal.

  • Glass and fixtures

    Frameless glass, wall-hung toilets and thermostatic valves add cost but also resale value.

  • Building rules

    Co-op and condo alteration agreements add insurance, hours limits and sometimes an engineer review.

Payments follow the work. A deposit at signing, progress payments as phases finish, the balance after the walkthrough. Ask about financing at the estimate.

Free estimate

Tell us about the project

We reply by phone or email. No spam, no sales calls from anyone else.

+ Add details (optional)

Prefer to talk? Call (347) 709-4333 or text photos of the space.

FAQ

How long does a bathroom remodel take?

Most full bathroom remodels take three to five weeks on site. Tub-to-shower conversions usually take one to two weeks. We give you a written schedule before demo starts and tell you the day the water goes off.

Do I need a permit for a bathroom renovation in NYC?

If plumbing lines move or fixtures are added, yes, a DOB permit is required and we file it. Replacing fixtures in the same location usually does not. We tell you which case you are in before you sign.

Can you work in a co-op or condo?

Yes. We carry the insurance most boards require, follow their work hours, and submit the alteration agreement paperwork with you.

Do you supply the tile and fixtures?

Either way works. Many clients pick their own tile and fixtures and we install them. We can also source everything and show you samples at the estimate.

Is the shower waterproofing warrantied?

Yes. We use a full membrane system installed to the manufacturer spec and stand behind the installation. Ask for the written terms at the estimate.

Planning a bathroom project?

Tell us about the space. We reply by phone or email.

Call now Get a quote